Roadstock: Eldorado & Virginia Pkwy Tour
Concrete Panel Replacement Project
Eldorado and Virginia Streets will be under construction for concrete panel replacements.
This project will replace damaged concrete panels and strip the roadway to improve the overall driving surface along Eldorado Parkway and Virginia Parkway.
- Eldorado Parkway | Ridge Road to U.S. 75
- Virginia Parkway | Stonebridge Drive to U.S. 75
One-mile segments will be completed before starting the next phase of the project.
Frequently Asked Questions
Phases
Phases overview
Phase 1: Eldorado Parkway
Eldorado Parkway
Phase 2: Virginia Parkway: Stonebridge Dr. to Hardin Blvd.
Virginia Parkway: Stonebridge Dr. to Hardin Blvd.
Phase 3: Virginia Parkway: Hardin Blvd. to U.S. 75
Virginia Parkway: Hardin Blvd. to U.S. 75
Virginia Parkway: Stonebridge Dr. to Hardin Blvd.
June 1, 2026 5:00 AM - August 31, 2026 4:59 AM
Virginia Parkway: Stonebridge Dr. to Hardin Blvd. | April 2026 - Summer 2026
During construction, additional repairs were identified, requiring adjustments to the project phasing and timeline. This phase began the first week of April and is expected to last 3–4 months, weather permitting. This phase includes:
- Stonebridge Dr. to Ridge Rd.
- Ridge Rd. to Lake Forest Dr.
- Lake Forest Dr. to Hardin Blvd.

